RapidRise logo RapidRise

Technology Readiness Levels: From Laboratory to Operation

By Daniel Lee Knight, Founder and Principal. Published 25 November 2026.

Technology Readiness Levels (TRL) measure how mature a technology is, on a 9 step scale from a principle observed in a laboratory to a system proven in operation. Aerospace, defence, energy and commercial buyers use the scale to guide funding, risk and development decisions.

The 3 Bands

A NASA researcher, Stan Sadin, devised the first scale in 1974, with 7 levels; NASA adopted the 9 level scale in the 1990s. The US Department of Defense, the UK Ministry of Defence (MOD) and the European Union, from the Horizon 2020 programme onwards, now grade technology on the same 9 levels, grouped in 3 bands.

TRL 7 to 9: demonstration and deployment Typical rounds: Series B to G, then exit
9 Actual system proven in operation
8 System complete and qualified
7 System prototype demonstrated in an operational environment
TRL 4 to 6: development Typical rounds: seed to Series A
6 System prototype demonstrated in a relevant environment
5 Components validated in a relevant environment
4 Components validated in a laboratory
TRL 1 to 3: research Typical funding: grants and pre-seed
3 Analytical and experimental proof of concept
2 Technology concept or application formulated
1 Basic principles observed and reported
The 9 levels, read from the bottom up. The red edge marks the valley of death, TRL 4 to 7. Typical rounds are for hardware and deep technology; software climbs faster.

TRL 1 to 3: research

The idea starts as theory and ends with the first laboratory or simulation evidence that the idea works.

TRL 4 to 6: development

Components, then a full prototype, pass tests in the laboratory and in conditions that simulate real use.

TRL 7 to 9: deployment

The system proves itself in the real operating environment, then in service.

The 9 Levels

1

TRL 1: Basic principles observed and reported

Scientific research begins, and fundamental principles are observed and documented. The concept is theoretical, with no experimental validation.

Evidence a buyer or investor expects:
Published or reproducible observations; a named scientific principle.
Typical funding:
Research grants and university funding.
2

TRL 2: Technology concept or application formulated

The idea is developed into a potential application. Practical uses are proposed, but no proof of concept exists yet.

Evidence a buyer or investor expects:
A written concept, a target application and a first patent search.
Typical funding:
Research grants; founders and angel investors at pre-seed.
3

TRL 3: Analytical and experimental proof of concept

Laboratory experiments or simulations validate the key functions. Feasibility is demonstrated at a small scale: the first experimental proof.

Evidence a buyer or investor expects:
Laboratory or simulation data showing the key function works; a first patent filing.
Typical funding:
Pre-seed; proof of concept grants such as EIC Pathfinder.
4

TRL 4: Component validation in a laboratory environment

A basic prototype or component is tested in a controlled laboratory setting to verify functionality under expected conditions.

Evidence a buyer or investor expects:
Component test reports from a controlled laboratory.
Typical funding:
Seed; development grants such as EIC Transition.
5

TRL 5: Component validation in a relevant environment

The prototype is tested in an environment that simulates real world conditions, for example an industrial or field setting.

Evidence a buyer or investor expects:
Test results in representative conditions, against a written test plan.
Typical funding:
Seed into Series A; government innovation contracts.
6

TRL 6: System prototype demonstration in a relevant environment

A high fidelity prototype operates under realistic conditions, with performance close to the final product specification.

Evidence a buyer or investor expects:
A full system demonstration in a relevant environment, measured against the requirement.
Typical funding:
Series A; defence innovation contracts that target TRL 6; EIC Accelerator grants.
7

TRL 7: System prototype demonstration in an operational environment

The prototype is tested in the actual operating setting, for example in space, on an aircraft or in a live industrial plant, often at pre-commercial scale.

Evidence a buyer or investor expects:
An operational trial with the end user, plus the user's written assessment.
Typical funding:
Series B; strategic and corporate investors; first operational contracts.
8

TRL 8: System complete and qualified

The final system is built and qualified through test and demonstration against its requirements. Regulated products, for example aircraft, also need certification before use.

Evidence a buyer or investor expects:
Qualification test reports, certification where required, a frozen production design, unit cost and a supply chain.
Typical funding:
Series C; growth debt and finance against confirmed orders.
9

TRL 9: Actual system proven in operational environment

The technology is used in real missions or commercial operations, proving reliability and effectiveness in full scale deployment.

Evidence a buyer or investor expects:
In service data, reliability figures and repeat orders.
Typical funding:
Series D onwards, private equity or public markets; export finance for exporters.

The Valley of Death: TRL 4 to 7

The Risk:

Grant funding tends to thin out around TRL 4 to 6, while conventional venture capital prefers TRL 7 and above. A company with a working prototype can run out of cash before the evidence that unlocks the next investor exists.

TRL sets the risk profile, and the risk profile decides the investor type. A TRL 6 company with granted patents and operational data sits in a lower risk class than a TRL 6 company with neither. 3 public bodies show where the bar sits:

  • UK Defence Innovation (UKDI) competitions ask for at least TRL 6 by the end of the project. Innovation Support to Operations Phase 3 Cycle 7, published on 24 February 2026, funds projects of 6 months or less, and Cycle 8 asks for deliverables within 4 months.
  • The European Innovation Council (EIC) funds the climb in stages: Pathfinder covers TRL 1 to 4; Transition takes TRL 3 or 4 to TRL 5 or 6; Accelerator grants cover TRL 6 to 8, with equity for scale-up at TRL 9 (EIC, 2026 Work Programme).
  • US Department of Defense guidance ties entry to engineering and manufacturing development, known as Milestone B, to technology demonstrated in a relevant environment: TRL 6 (DoD Technology Readiness Assessment Guidebook, 2023).

TRL Measures the Technology Only

A technology at TRL 9 can still fail to sell. Buyers and investors ask 3 further questions, each with a scale of its own:

Can the item be made?

Manufacturing Readiness Levels (MRL) test production at the required cost, rate and quality. The US Department of Defense scale runs from MRL 1 to MRL 10.

Does the system fit?

Integration and System Readiness Levels (IRL and SRL) test whether the technology works inside the larger system and connects to the neighbouring systems.

Will anyone adopt the system?

MITRE's Technology Maturity and Adoption Framework (2025) adds transition confidence, requirements readiness and user readiness: will procurement accept the technology, does a validated and funded requirement exist, and will users adopt the technology?

The RapidRise Angle:

A technology at TRL 9 with no funded requirement still has no buyer. Map the buyer's budget line and procurement route as early as TRL 4.

Software Moves Faster

Software often reaches TRL 7 or 8 by seed or Series A. Hardware, biotechnology and defence platforms take longer and need more capital at each level, and round sizes show the gap.

On Carta, the median hardware seed round in 2026 raised USD 6.1m at a USD 27.2m pre-money valuation (the company's value before the new cash arrives). The median hardware Series A raised USD 26.1m at USD 108.4m. Hardware startups on Carta raised nearly USD 34bn in the first 3 quarters of 2026, more than double the same period of 2025 (Carta, State of Private Markets, Q3 2026).

TRL and Funding

What each band proves, and who pays for the next step (hardware and deep technology)
TRL band What is proven Typical rounds Typical sources
1 to 3 The science works Pre-seed and grants Founders, angels, accelerators, grant bodies
4 to 6 A prototype works in a relevant environment Seed to Series A Deep tech venture funds, government innovation funds, corporate venture arms
7 to 8 The system works in operation and is qualified Series B to C Growth venture funds, strategic investors, sovereign funds
9 The system is proven in service and in production Series D to G, then exit Crossover funds, growth equity, private equity, public markets

The full table on the Startup Funding page adds the instruments, debt, dilution and commercial leadership at every stage from pre-seed to exit.

The RapidRise View

RapidRise maps each TRL step to the evidence a buyer and an investor need, and to the funding route that pays for the next step. A founder at TRL 5 leaves with a list: the test results that unlock a defence innovation contract, the results that unlock a Series A, and the results that unlock both. See RapidRise services.

Further Reading

Facts checked to 25 November 2026.

Discuss Technology Readiness

Need help planning the route from prototype to procurement?

Get in touch
← Back to All Insights